top of page
Axono.PNG

Advanced Architectural Construction

this was a leap into deeper understandings and applications of the construction and structural aspects of architecture

and learnt about IBS and gained the exposure to the integration of this, a construction module and studio.

Back to Top

1. Industrialized Building System

Industrialized Building System

in a group of 5,
gained reference from a precedent building that used IBS,
to design an apartment unit. 

a unit not exceeding 100 square meters, to include a living space, dining space, 3 bedrooms and 2 toilets.
and incorporate IBS method.
and has 3 levels.

in an A3 size report with the IBS categories and components,
and IBS score evaluation.
attached relevant drawings and proposed construction sequence. 

IBS Score Evaluation of Apartment Unit Design

IBS Score Evaluation-1.png

A3 Size Report Proposal of Apartment Unit Design 

2. Construction Solutions

Construction Solutions

individually,
research on precedent studies on alternative construction systems that can be applied to Studio IV design project.

analyze the construction systems in precedents.

then,
produce an A3 size report,
including two alternative facade schemes, and a fully annotated sectional perspective including two interesting spaces.

A3 Size Report on Construction Solutions for Design Project

Fin.

bottom of page